16October2018



TELMAR

You are here: Home News Offshore wind HBC Wraps Up Ørsted Subsea Inspection Campaign

Error in function saveImage: Could not save the output file '/home/conceptualklt/www/telmar/cache/wwwoffshorewindbizwp-contentuploads201808hbc-wraps-up-orsted-subsea-inspection-campaign-320x208jpg_thumb_medium200_0.jpg' as a jpeg.

HBC Wraps Up Ørsted Subsea Inspection Campaign

Image source: HBC[1]

HBC Group has completed the Ørsted Subsea Inspection Campaign on four offshore wind farms in the UK and the German North Sea.

The 2018 inspection campaign was carried out on Race Bank in the UK, and Borkum Riffgrund 1, Gode Wind 1 and Gode Wind 2 wind farms in Germany.

In the past three years, HBC has performed a wide array of subsea inspection and maintenance tasks during the Ørsted campaigns across Denmark, Germany and the United Kingdom.

Last year, HBC inspected Borkum Riffgrund 1 and Gode Wind 1 and 2, as well as Horns Rev 2 in Denmark. In the UK, the company worked at the London Array, Westermost Rough, Barrow, Walney, and Burbo Bank 2 in 2017.

Posted on August 10, 2018 with tags HBC Group[2].

References

  1. ^HBC Wraps Up Ørsted Subsea Inspection Campaign (www.offshorewind.biz)
  2. ^HBC Group (www.offshorewind.biz)

Read more


CONCEPTUAL KLT 
ATOS ORIGIN IH Cantabria
SODERCAN